Monday, June 25, 2018
Basketball - Patrick
With a little more freedom as the house sale progresses, we managed to see Patrick (and Sophie) play this weekend. The match was a bit of a nail-biter with the two teams closely matched.
In the last few minutes the boys were ahead by only 2 points with the opposition on the attack so there was some tension on the bench however they held on for a win.
In the last few minutes the boys were ahead by only 2 points with the opposition on the attack so there was some tension on the bench however they held on for a win.
Saturday, June 23, 2018
The Move Progresses
The major furniture items have all been moved out of Efron St ready for the staging and sale. The move was scheduled for a day that threatened rain but the transition occurred without a major hydrological incident.
And the fun has started cramming all our stuff into the limited available space in Unit 2
And the fun has started cramming all our stuff into the limited available space in Unit 2
Wednesday, June 20, 2018
Tuesday, June 19, 2018
Adam and Kate's New Kitchen
A lot of thought and planning has gone into the new Donvale kitchen but all the work is starting to show as the new kitchen approaches completion. The new picture window is spectacular opening the whole back of the house and giving wide views across the pool and the valley beyond. There is a little more work to go (painting etc) but the first meal in the new facility is approaching.
Friday, June 8, 2018
The Floor is Down
The final upgrade for Unit 2 has been completed today so we can finally move in. The floor covering had to wait until the painting and lighting had been completed but we are happy with the result.
Having had the old carpet removed and the floor fixed, the new long board coverings are a great improvement.
Having had the old carpet removed and the floor fixed, the new long board coverings are a great improvement.
Wednesday, June 6, 2018
The Move is Underway
We have finally taken the step to move out of Efron St and build a new home at Luckie Street. To facilitate the transition we have been undertaking major works at Unit 2 so that we can live there comfortably while the build is occurring. New LED lighting has been installed throughout and the whole house painted.
The old (and very tired) garage door has been replaced and the new flooring is about to be installed.
The old (and very tired) garage door has been replaced and the new flooring is about to be installed.
Subscribe to:
Posts (Atom)