Tuesday, November 6, 2012

New Van Ordered

Well - we have finally sorted out the van we want for our future touring needs.  We decided on a small Trakmaster van (13 foot 6 inches - for some reason vans are still measured in the old money!).
It will look something like this.
These are off road caravans that are hand built to the customer specification so we we have set out the interior as we want it and it will take about 6 months to complete.
We will have some flexibility with the design until the interior is being built.  Once finished we should have the capacity to be "off the grid" for a considerable period of time as it will incorporate solar power, diesel heating, hot and cold water systems, shower, water filtration etc

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.