 With assistance from Cooper, Mark erected scaffolding on the east side to give access to the high windows.

This meant the window surrounds and the deck platform could be put in place.  There were a few trips with heavy trailer loads to get all the metal up to the block.
During the school holidays, additional workers helped install the window surrounds.
The battery is now in place together with some preliminary wiring.  The solar panels are keeping the power up so Mark now has a charging station and some light to work by.
Using a small excavator, Mark put the frame for the external deck in place.  Views acros the valley will be amazing.