With the sewage system in place, the next plumbing task is to connect all the components. A special drill was required to install the underfloor drainage and water collection systems.
The tanks are connected so when the rain does come it can be pumped from the lower collection tank into the storage tanks at the rear.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.