Tuesday, August 16, 2022

Movement at Goughs Bay

 With all the approvals now in place, Mark the Builder was able to arrange for the excavations to start on the block.  The massive stump in the middle of the block was first to go.

Now the ground has been prepared for the building and water tanks at the rear.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.