The heavy double glazed windows for the Lake House required a crane to move them into position. The Operator had to bring her rig up from Melbourne to do the job.
Now the windows are in place, the waterproofing membrane has to be applied to the external walls.
The next task is to set up the solaar panels to charge the battery bank.